4. Install the Carrier
Align the front of the frame flush or no more than 1/16" (2 mm) behind the face of the studs. If the frame protrudes past
the face of the studs, the wall material can be damaged. If the front of the frame is recessed too far, the bowl will not be
fully supported and may move during use.
Verify that the front of the carrier is plumb.
Mark the hole locations for the six lag bolts, one for each foot and two on each side of the carrier.
Drill pilot holes (remove the carrier if needed) at the marked locations.
NOTE: If the carrier is installed onto a concrete subfloor, use concrete expansion bolts (not supplied) when securing the
feet of the carrier.
Secure the carrier to the support studs using 3/8" x 2" (51 mm) long (minimum) lag bolts (not supplied), one at each
location.
Kohler Co.
Lag Bolts
7
1247365-2-C