REPAIR ( CONTINUED )
Replace Power Switch
NOTE: Electrical wiring and connections must be made only by a licensed
electrician in accordance with national, state and local electrical codes
regarding Class I, Division 1, Group D locations. This includes but is not
limited to the National Fire Protection Association (NFPA) Code 70, Article
501.15(A)(1). Other codes may apply.
1.
Turn the pump OFF and disconnect from power.
2.
Remove the switch coverplate from the pump housing (see Figure 13).
3.
Remove the Torx head screw, then remove the switch assembly
(see Figure 14).
4.
Unscrew both terminals and remove red pump wires from the back
of the switch (see Figure 15).
5.
Install a new switch by reversing the above procedure. Insert the switch
assembly into the pump cavity. Make sure the O-ring is seated properly
before tightening the switch coverplate.
NOTE: For the proper operation of the switch lever and cam, attach
the mounting plate to the switch with a clearance of 0.175 in. or about
3/16 inch (4.44 mm) (see Figure 16).
Figure 13
Figure 15
Replace Motor
In order to preserve the UL Listing or CSA Certification for pump safety,
return the entire pump to the factory for motor repair or replacement. For
products serviced outside the factory, the UL and CSA nameplates must be
defaced to indicate the equipment may no longer meet the requirements
for UL Listing or CSA Certification. This does not apply to products serviced
outside the factory under the UL program for Rebuilt Motors for Use in
Hazardous Locations and the CSA rebuild program.
12
EN
Torx
Screw
Figure 14
0.175" (4.44 mm)