Every operation of installation, electrical or hydraulic
connection, programming, maintanance etc...has to
be carried out by QUALIFIED personnel, authorised
by the manufacturer;
EN
any interventions carried out by UNQUALIFIED person-
nell, may compromise the technician's own safety, as
well as the safety of other personnel (operators, etc.)
or of any other equipment connected to the washing
machine.
The manufacturer declines all responsability for
accidents or damage to persons or property caused
by failure to comply with the above listed provisions.
3.1
INSTALLATION (Fig. 6)
-
After having removed the packing, check that the
machine is in a perfect condition and that all the
parts have been included.
-
Position the machine in the required setting and level
it by means of the feet (10).
3.1.a Drain pipe connection (Fig. 6)
-
Connect one end of the drain pipe to the overflow
(11) and the other to an already prepared drain
trap.
It is essential to ensure that the drain pipe runs along
the floor and that it is not throttled in any part.
3.1.b Connection to the water main (Fig. 6)
-
Connect one end of the supplied inlet pipe (12) to
the solenoid valve and the other end (12) to a 3/4"
G threaded cock, installing the filter (13) in between.
It is essential to connect the cold water delivery pipe
to a throttle cock in order to separate the water main
from the machine itself. Also check that there are no
sharp bends.
If there is sand in the water main, it will be necessary to
install a filter between the water main and the machine.
If the water main is without, it is advisable to install a
decalcifier prior to the machine with a setting of min. 4
and max. 8 French degrees.
The manufacturer declines all responsibility for da-
mage to the machines caused by failure to comply
with the above listed provisions.
24
IMPORTANT
IMPORTANT
ATTENTION
3.1.c Electrical connection (Fig. 5)
DANGER
-
Before connecting to the electricity main, always
check that the data pertaining to the power
source correspond to those indicated on the
identification plate (pos. 9 Fig. 5) and that the
main electric power switch installed prior to the
machine is disconnected "0" OFF.
-
An appropriately sized omnipolar circuit-breaker
with a minimum 3 mm gap between its contacts
must be installed between the power supply main
and the machine.
-
Connect the electrical power cable (14) to the
main switch installed prior to the machine
-
Connect the equipotential ground conductor to
the terminal (15).
The electrical power cable can NOT be replaced
by USER but only by technical.
There must be an effective system grounding,
according to current standards of prevention,
for operator safety and equipment.
The power cord must not be put in traction or
crushed during normal operation or routine
maintenance.
The terminal of equipotentiality fixed to the body
must be connected to an equipotential bonding
conductor of section suitable for the application.
Observe the polarity of the wiring diagram.
For more information, refer to the wiring diagram.
The manufacturer declines all responsibility for
accidents or damage to persons or property
caused by failure to comply with the above listed
provisions.
3.2. STANDARD Parameter Settings
With the machine switched off, press the "S1" button
for 10 sec.; all parameters (P-T-L) are automatically
set asin the tables.
The message "PSt" will appear on the display, con
firming that the settings have been programmed.