Mounting and commissioning
1.1 Disconnect the power supply.
1.2 Mount the meter. 4
1.3 Strip the wires according to the strip guide.
1.4 Connect the wires according to the guide on the
side of the meter.
value is 4 Nm. Screwdriver pozidrive 2 or flat
blade 6 mm. The terminals must be retightened as
the last step of the installation.
1.5 Circuit protection 80 A (MCB, type C, Diazed type
GL-gG).
1.6 Verify that the meter is correctly wired and that
the voltage is according to the technical specifica-
tion before the power is turned on.
1.7 Verify that the load indicator is rotating clock wise
when the load exceeds the start current.