Descargar Imprimir esta página

CEMO 60I Manual Del Usuario página 17

Sistema de depósito móvi compuesto por depósito de pe de una pared con bomba de manivela

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

7. Decommissioning
i
Note:
Better total evacuation is achieved when
the tank is in the horizontal position.
Optimal total evacuation is achieved
when the transport handle is raised ap-
prox. 20 cm in the horizontal position.
1. Drain the tank completely (by means of the
pump via the delivery hose and delivery noz-
zle).
2. Disassemble the trolley into its constituent
parts.
3. Sort accordingly by material characteristics.
4. Dispose of in compliance with local regula-
tions.
Danger
of environmental contamination through
residues in the tank.
Collect these residues separately and
dispose of them in compliance with local
environmental regulations.
8. Warranty
We warrant that the filling station will be produced
free from defects in materials, functionality or work-
manship under our general terms and conditions
of trade.
These can be viewed at
http://www.cemo.de/agb.html
The warranty applies only under the condition that
the above operating and maintenance instructions
and all applicable regulations are closely followed.
Any modification of the filling station by the cus-
tomer without consultation with the manufacturer
CEMO GmbH invalidates any claims under the
statutory warranty.
CEMO GmbH also accepts no responsibility for
damage caused by inappropriate use.
GB
17

Publicidad

loading

Este manual también es adecuado para:

100i1110011101111271113010873