Installation
Drilling of walls and fixing of supports
Internal circulation
1. Place the adhesive sponge strips on the
sponge.
FLUSH INSTALLATION
Place the assembly in the ca-
binet and adjust the product.
STANDARD INSTALLATION
Board width (Y)
600-650mm
≥650mm
2. Install the waste water tank
and adapter. Please glue and
fix after installation.
46
English
X
54mm
65mm
infiniton.es