Measures For Preparing Welding - Rothenberger ROWELD P 160 B Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 36
Factory settings:
Menü „CFG"
„S.tu"
0
„h.Pb"
1.0
„h.lt"
0.68
„h.dt"
0.17
„h.P.H"
100
„rst"
0
„P.rE"
0
„SoF"
0
„Lb.t"
0
„Lb.P"
25
„FA.P"
0
Note: The autotuning function could cause the details under "CFG" to deviate minutely. Should
hunting occur, the autotuning function can be activated while the heating plate is cold (set
the menue item "S.tu" to "2" (two) in CFG menue, the system automatically resets the pa-
rameter to "0" (zero).
For lifting the milling equipment and the heating element, use lifting device 53410 or 53323, or a
suitable tool.
3.2.2

Measures for preparing welding

Pipes smaller than the maximum welding range (diameter) of the machine, mount the
adapter clamping inserts suited for the pipe diameter with the Allen screws found in the ac-
cessories kit.
ROWELD P200B: Ø63-140mm: consisting of six wide-surface shells and two small-surface
shells. Ø160-180mm: consisting of 8 wide-surface shells.
ROWELD P160-355/5-12B: consisting of six wide-surface shells and two small-surface shells.
ROWELD P500-630/18-24B Plus: consisting of six wide-surface shells and two small-surface
shells (for diameters up to 450 mm) or 8 wide-surface shells (for diameters >500 mm).
In so doing, please observe that the small-surface shells are mounted to the two lower external
main clamps. These are used in the left basic clamping element below and above only for pipe
to pipe bend connections.
Insert the plastic pipe or fitting in the clamping device (use dolly with longer pipe < 2,5m sec-
tions) and tighten brass nut on the upper clamps. Adjust brass nuts (tighten or loosen) to
compensate for any ovalness.
For P200B:
The machine is operated with 4 basic clamping jaws in the case
of pipes/ pipe connections (welding position A).
The 4th basic clamping jaw can be removed in the case of
narrow pipes/ fitting connections (welding position B). To do
this, initially remove the screws (3) and then slightly loosen the
screws (5). The 4th jaw can now be pulled out together with the
sub-construction. Finally, unscrew the spacers (4) and replace
them by the screws (3).
For pipe-to-pipe connections, the two spacers must be engaged in
both left clamping elements (standard configuration at delivery).
Attention: Under no circumstances should the spacers be installed diagonally offset!
The pipes are each held by two clamping elements.
18
Menü „InP"
„Ctr"
8
„tYP"
16
„FLt"
0.1
„FLd"
0.5
„dP.S."
0
„Lo.S"
0
„HI.S"
300
„oFS"
xx
„HI.A"
0
„Lo.L"
0
„HI.L"
280
ENGLISH
Menü „Out"
„AL.n"
0
„r.o.1"
0
„r.o.2"
0
„Ct.1"
20
„Ct.2"
20
„rEL."
0
Menü „PAS"
„Prot"
32

Publicidad

Tabla de contenido
loading

Tabla de contenido