Connection To The Multifunction Relay - SMA SUNNY TRIPOWER CORE1-US Instrucciones De Instalación

Ocultar thumbs Ver también para SUNNY TRIPOWER CORE1-US:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

6 Electrical Connection
Reporting the switching status of the grid relay
The multifunction relay can trip a signal to the grid operator as soon as the inverter connects to the
utility grid. To enable this function, the multifunction relays of all inverters must be connected in
parallel.
Inverter 1:
Grid relay closed
Inverter 2:
Grid relay open
Inverter n:
Grid relay open
Figure 11 : Wiring diagram for signaling the switching status of the grid relay (example)
6.4.4

Connection to the Multifunction Relay

Additionally required material for the use of conduits (not included in the scope of
delivery):
☐ Conduit (trade size: 27 mm (1 in) or smaller with suitable reducer bush)
☐ Rain-tight or conduit fittings for wet locations complying with UL 514B (trade size: 27 mm
(1 in) or smaller with suitable reducing bush)
36
STP33-62-US-41-IA-xx-12
B
F
1
2
3
B
F
2
1
3
B
F
2
1
3
SMA Solar Technology AG
max. 30 V
DC
Signal to
1 kΩ
grid operator
=
Installation Manual

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Stp 33-us-41Stp 50-us-41Stp 62-us-41

Tabla de contenido