Initial Setup Via Lcs-Tool; Switching On The Pv Load-Break Switch; Commissioning - SMA SUNNY HIGHPOWER PEAK1 Instrucciones De Instalación

Ocultar thumbs Ver también para SUNNY HIGHPOWER PEAK1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

3 Initial Setup and Start
Button
Function
On – green LED
Alarm – red LED
Table 3.2 Display with control and function buttons
The screen design is divided into different sections:
1. Main screen. Current and daily yield.
This section contains:
– Actual output power (kW)
– Yield of the current day (kWh)
– Total yield (kWh)
– Current date.
– Current time
– Operating mode (#)
2. Inverter information. This section contains:
– Inverter device type
– Inverter name
– Inverter serial number
– IP address
– Serial number of the SMA Inverter Manager
– Software version of the inverter
3. Actual values This section contains:
– PV voltage and current
– Phase-to-phase voltages
– Phase currents
– Grid frequency

3.2.1 Initial Setup via LCS-Tool

The inverter and the SMA inverter manager must be
commissioned via the local commissioning and service tool
(LCS-Tool). Commissioning is necessary before the inverter
is connected to the AC utility grid and feed-in operation
begins.
The LCS too enables the selection of predefined country
data sets for different utility grids. Customer-specific country
data sets can be provided by SMA and imported via the
LCS-Tool (see installation manual of the SMA Inverter
Manager / SMA Digital I/O Box / LCS-Tool).
After installation, check all cables and close the inverter.
Turn on AC power.
32
SHP75-10-STP60-10-IA-xx-18
Selecting the correct grid code is important in order to
comply with the local and national standards.
It is possible to create customer-specific grid code files
with adjusted set values (see Section 3.2.4).
3.2.2 Switching on the PV
Load-Break Switch
Figure 3.2. PV load-break switch
Switch on the PV load-break switch at the inverter and, if
available, at the PV array junction box.

3.2.3 Commissioning

The inverter starts automatically if sufficient solar irradiation
is available. Commissioning takes a few minutes. During this
period, the inverter performs a self-test.
INFORMATION
The inverter is protected against short-term reverse
polarity. The inverter does not generate feed-in
power until any reverse polarity is corrected.
Prolonged reverse polarity leads to a failure of the inverter
and thus will void the warranty.
• Make sure that the cables are correctly connected to
the inverter.
SMA Solar Technology AG
Installation Guide

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sunny tripower 60

Tabla de contenido