System-Related Events
ID
Status
message
2000
2010,
2011
2012 -
2018
2030
2050
2051
2052,
2053
2054
2055
Fallback
activated
2056
Fallback
completed
Table 4.3 System-related events
Installation Guide
Description
Communication assembly is
booting.
The software update of the
main CPU has started / has
finished.
The software update failed.
Transmission of the grid code
to the main computer failed.
Ethernet connection is active
Ethernet connection is
disconnected
Transmission of the Grid Code
from the SMA Inverter
Manager to the inverter has
started/ended.
Transmission of the Grid Code
from the SMA Inverter
Manager to the inverter has
failed.
The inverter switched to the
fallback mode after the
communication with the SMA
Inverter Manager was
interrupted.
The inverter has switched back
to normal operation after
having been in the fallback
mode due to a communication
disturbance with the SMA
Inverter Manager.
Measures
-
-
Restart the software update. If an
error occurs during the update,
contact Service.
If this event occurs frequently,
contact Service.
No measure necessary. This error is
used, for example, to identify bad
Ethernet cables.
No measure necessary. This error is
used, for example, to identify bad
Ethernet cables.
-
If this event occurs frequently,
contact Service.
SHP75-10-STP60-10-IA-xx-18
4 Service
DNO SMA
PV
Service
Line
-
-
-
-
-
-
-
x
-
-
x
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
37

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sunny tripower 60

Tabla de contenido