Torque Specifications - SMA SUNNY HIGHPOWER PEAK1 Instrucciones De Instalación

Ocultar thumbs Ver también para SUNNY HIGHPOWER PEAK1:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

SMA Solar Technology AG

5.4 Torque Specifications

Figure 5.2 Overview of inverter with torque indications
Torques SHP 75-10
Parameters
A
M63 cable gland
Swivel nut of the M63 cable gland Wrench 65/68 mm
B
AC terminals
C
Primary grounding conductor
(secondary grounding conductor
directly to the right of it)
D
PV terminals
E
M32 cable gland
Swivel nut of the M32 cable gland Wrench 42 mm
F
M25 cable gland
Swivel nut of the M25 cable gland Wrench 33 mm
G
M6 equipment grounding
(equipotential bonding terminal)
Front screw (not shown)
Table 5.7: Torques SHP 75-10
Installation Guide
Tools
Wrench 65/68 mm
HX 8 x 50
TX 30
HX 8 x 50
Wrench 42 mm
Wrench 33 mm
TX 20
TX 30
Torque
11 Nm
9.5 Nm
20 Nm (cable sheath diameter = 35 to 95 mm);
30 Nm (cable sheath diameter = 96 to 150 mm);
3.9 Nm
20 Nm (cable sheath diameter = 35 to 95 mm);
30 Nm (cable sheath diameter = 96 to 150 mm);
6 Nm
1.8 Nm
4 Nm
1.8 Nm
3.9 Nm
1.5 Nm
SHP75-10-STP60-10-IA-xx-18
5 Technical Data
45

Publicidad

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Sunny tripower 60

Tabla de contenido