Sime SOLO 25 ErP Instrucciones De Instalación Y Mantenimiento página 75

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

– In case of fault and/or incorrect operation, deactivate it without making any repairs or taking any direct action. If fuel or
combustion is smelt, air the room and close the fuel interception device. Contact the authorised technical staff.
– The installation of the boiler and any servicing or maintenance job must be carried out by qualified personnel.
– It is absolutely prohibited to block the intake grilles and the aeration opening of the room where the equipment is
installed. The intake grilles are indispensable for a correct combustion.
IGNITION AND OPERATION
BOILER IGNITION
(figs. 19 - 20)
Press the main switch for lighting the
boiler. The green light turns on to indi-
cate that the appliance is powered (fig.
19). In the "DUETTO 25-35" version
choose the position Summer/Winter
on the switch (fig. 20):
– The boiler oper at es in tr eat ed
phase wit h t he switch in t he
GREEN LIGHT ON
USER INSTRUCTIONS
WARNINGS
position
– The boiler operates both in treated
phase as well as for heating with
the switch in the position
TER). The room stat or the chrono-
stat will stop the operation of the
boiler.
TEMPERATURE ADJUSTMENT
(fig. 21)
The heating temperature can be
adjusted by turning the knob of the
thermostat which has a range of
Fig. 19
Fig. 20
(SUMMER)
(WIN-
60°C
between 45 and 85°C.
The t emper atur e se tting can be
checked on the thermometer.
To ensure optimal boiler efficiency at
all times, we recommend not to drop
below a minimum working tempera-
ture of 60°C (fig. 21).
SAFETY STAT
(fig. 22)
The safety stat is of the manually
resetting type and opens, causing the
main burner to turn off immediately,
Fig. 21
75

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

Solo 35 erpDuetto 25 erpDuetto 35 erp

Tabla de contenido