2.
Loosen and remove the connector cap (A).
3.
Feed a 3-core supply cable (C) through cable gland
(A) and the connector cap (B).
N
2
1
1
L1
N
N
PE
4.
Loosen the screws (B).
5.
Insert the wires (A) into the correct holes of the
connector plug.
6.
Fasten the screws (B).
11
A
7.
Fasten the connector cap (B) to the connector (C).
8.
Put back the connector in the frame.
9.
Fasten the cable gland (A).
A
B
C
/i
Contact
External refill
Common fault
Boiler interlock
BMS
A
10.
If an external contact (external refill, common fault,
and/or boiler interlock) or BMS is used, connect the
B
cables of the external contact or BMS to the correct
connector in the power box (A).
English
A
B
C
A
Connector
Blue
Grey
Yellow
Purple
User manual - 1.0