Installing the unit
5.
Screw on the two lower attachments.
6.
Check that the unit properly secured.
Once the unit has been installed correctly, the connection process will begin.
Make the connections in the following order:
1.
Connection of accessories (optional).
2.
AC connection.
3.
DC connection.
CAUTION
It is mandatory to follow the order described above. Do not switch on the power until you have made all the
connections and closed the unit.
6.3. Opening and closing the housing
CAUTION
Under normal operating conditions it is not necessary to open the top compartment.
ABS2011IQM01_D - Installation and Operation Manual
Ingeteam
DE
EN
ES
FR
IT
PT
79