DC connection
3.
Screw in the terminal with a torque of 28 Nm.
4.
If the membrane has been used for passing the cables, check that it is correctly fitted in the unit. If a
packing gland has been used, ensure that it has the correct sealing, leaving a bit of slack in the cables so
they are not tight.
5.
Fit the polycarbonate guard.
6.
Close the lower compartment.
ABS2011IQM01_D - Installation and Operation Manual
Ingeteam
DE
EN
ES
FR
IT
PT
93