USER'S MANUAL. PROLINK-4/4C
Figure 51.- Calibrate function selection for Sat IF Test.
2.- MEASUREMENT OF THREE PILOTS THROUGHOUT THE NETWORK
Once PROLINK-4/4C
point where it will be connected the satellite dish (signal source) and start to take level
measurements in the different distribution outlets using the PROLINK-4/4C Premium.
On the screen will appear the attenuation values for the three pilot frequencies
measured in the outlet plug (see the following figure).
06/2005
Premium
10
FUNCIONES
0
-10
-20
- - MHz
- - MHz
REF.
- - dBuV
- - dBuV
TEST
- - dBuV
- - dBuV
ATT.
Figure 50.- Sat IF test.
FUNCTIONS
CALIBRATE
END TEST
BATTERY& LNB
DISEqC
NEXT
Premium
has been calibrated, connect the RP-050 to the
- - MHz
- - dBuV
- - dBuV
1/2
Page 83