Eaton xChargeIn Serie Manual De Instalación página 285

Estación de carga para vehículos eléctricos
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 320
xChargeIn
7.3.2
Connecting the voltage supply
The charging station can be connected in the following ways:
The supply terminals are designed as spring-type terminals. The handling in-
structions enclosed in the terminal area must be observed.
Caution
Risk of breaking the terminal!
Do not press the screwdriver up, down or to the side!
To connect the supply voltage, proceed as follows:
1) Shorten the connection wires to the appropriate length (as short as pos-
Installation manual V1.05
© EATON
Make sure that the connection cables are inserted centered, straight and
without pressure through the double-membrane seals to ensure seal
tightness.
The installation pipe or cable conduit with the feed line may not be
screwed together in the cable gland (above) or run through the double-
membrane seals (behind).
The supply line must be routed straight through the cable gland resp. the
double-membrane seals in compliance with the bending radii (approx.
cable diameter times 10).
For surface-mounted cable installation, the cable gland must be installed
properly and screwed together sufficiently tight.
1-phase: via terminals
L1, N and
PE
sible). The protective conductor
conductors!
Connections and wiring
3-phase: via terminals
L1, L2, L3, N and
PE
must be longer than the other
PE
285

Publicidad

Tabla de contenido

Solución de problemas

loading

Tabla de contenido