EVBOX Elvi Manual Del Usuario página 15

Ocultar thumbs Ver también para Elvi:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

EN
Change charging cable
(optional)
8
When upgrading your charging cable to a version that is suitable for higher power application,
make sure that the applied RCD and MCB in the service panel are in line with local regulations,
and are also adequate for the type of charging cable installed and the amount of power Elvi can
supply (max 30 A / 7.2 kW on split-phase installation).
Check with your installer whether the selected output power from your Elvi can be supported
by your local electrical installation. The setting of your maximum available amperage may need
to be adjusted in the mobile station management application and/or backend portal account as
provided by the operator or service provider for this product. For further details, contact your
operator or service provider.
12

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Tabla de contenido