Ingeteam
13. Connecting the CAN communication of the storage
system management system
Installing the CAN communication enables the inverter to control the storage system management system.
This chapter explains the requirements and process for wiring the storage system CAN communication to the unit.
Read carefully before starting the connection process.
13.1. Safety instructions for connecting the CAN communication of
the storage system management system
Before you start to make the connections, make sure there is no voltage in the inverter. Check that
the AC protection of the auxiliary grid/genset and the DC switch are open.
Do not switch on the power to the unit until you have successfully made the rest of the connections
and the unit is closed.
13.2. Wiring requirements for connecting the CAN communication
of the storage system management system
The wiring gauge for connecting the CAN communication of the storage system management system is specified in
the following table:
Temperature sensor wiring gauge
Cable diameter
13.3. Connection process of the CAN communication of the storage
system management system
To connect the CAN communication:
1.
Loosen the corresponding packing gland (see Section "2.7. Description of wiring inlets"), remove the cap
and pass the cable through it.
2.
Connect the wiring to terminal J18 CAN BATTERY as shown in the previous figure, respecting the printed
instructions on the screen-printed electronic card (H: high, L: low, GND: GND). Ingeteam recommends using a
tubular terminal in accordance with DIN 46 228/1.
3.
Correctly tighten the packing glands to prevent losses to the protection class, verifying that the wiring is
not taut. Check that the connection is tight.
80
Connecting the CAN communication of the storage system management system
INGECON SUN STORAGE 1Play
0.25 mm
ABH2013IQM01_A - Installation and Operation Manual
~ 1.5 mm
2
2
4.5 ~ 10 mm