Shutting Down The Unit; Process For Shutting Down The Unit - Ingeteam INGECON SUN STORAGE 1Play Serie Manual De Instalacion Y Uso

Ocultar thumbs Ver también para INGECON SUN STORAGE 1Play Serie:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 105

Shutting down the unit

21. Shutting down the unit
This section describes the procedure to shut down the unit.
If you wish to work inside the unit, you must carry out these instructions in the order shown here to
remove the power.

21.1. Process for shutting down the unit

1.
Manually stop the inverter, using the START/STOP option in the display menu.
2.
Remove both the direct voltage (Vdc) and the alternating voltage (Vac) arriving at the unit.
3.
Wait 10 minutes for the internal capacitances to discharge, the hot parts which may cause burns to cool
and the fan blades to stop turning.
4.
Check there is no voltage.
5.
Signal cut-off point (Vac and Vdc) with a sign reading ¨Caution no switching...¨. If necessary, rope off the
work area.
ABH2013IQM01_A - Installation and Operation Manual
Ingeteam
DE
EN
ES
FR
IT
PT
99

Publicidad

Tabla de contenido
loading

Tabla de contenido