EdilKamin LAGUNA M 25 Instalación Uso Y Mantenimiento página 78

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 137
INSTRUCTIONS FOR USE
START-UP
Check inside the combustion chamber and the fuel tank that there are no objects or other material
belonging to the boiler, then proceed as follows:
• Ensure the crucible is positioned correctly;
• Check the ash drawer is present;
• Open the upper lid and cover the tank;
• Electrically power the boiler using the main switch;
• Check the door is fully sealed when closed.
Press the
key to start the boiler.
From the OFF status, bring the boiler to CHECK UP.
Attention: switch on is not permitted in the presence of alarms, which should be firstly removed
by pressing the
key.
Friday 09:35
During the CHECK UP the boiler checks the probes and cleans them with the fan at full speed.
At the end of this phase, the boiler goes to SWITCH ONstatus during which pre-heating of the igni-
tion glow plug, the initial loading of fuel and waiting for the flame to ignite occurs.
Having reached the smoke temperature of 50°C, the glow plug switches off and partial loading of
the fuel continues. At 60°C the flame is declared present, therefore the boiler goes to STABILISA-
TION, a status during which the flame stabilises and combustion strengthens.
Having reached an adequate smoke temperature and 4 minutes have passed with a stable flame
present, the system passes to NORMAL bringing the boiler to the desired power.
Friday 10:14
Normal
- 78
-

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Laguna m 33

Tabla de contenido