Seasonal Maintenance - EdilKamin FANTASY Instalación Uso Y Mantenimiento

Ocultar thumbs Ver también para FANTASY:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 72

SEASONAL MAINTENANCE

onsists in:
lean the stove internally and e ternally
arefully clean the heat e change tubes
arefully clean and remove dirt from the combustion chamber and the relative compartment
lean fans, verify mechanical and clamp loosening
lean smo e channel (replace seals on smo e e haust pipe)
lean smo e duct (see wee ly cleaning)
lean smo e e traction fan compartment.
lean smo e ow sensor.
lean smo e chec thermocouple.
lean, inspect and scrape any residue from the ignition resistance compartment and if necessary, replace it
lean chec the Synoptic anel
isually inspect the electrical wires, connections and power cable
lean the pellet hopper and chec loosening of the feed screw - gear motor assembly
Replace the door seal
Functionality test: load the feed screw, ignite, let it run for
If the stove is used very often it is reco
After i ple enting a nor al cleaning procedure INCORRECT coupling of the upper (A) ( gura 1) and lower
(B) ( gura 1) co bustion cha bers can co pro ise the stove s perfor ance.
Before igniting the stove
unburnt
aterial present on the support peri eter.
A
B
g.
MAINTENANCE
(i ple ented by the EALER)
ended to clean the s o e channel every
ATTENTION !!!
a e sure the co bustion cha bers are correctly paired as indicated in ( g. 2) without ash or
minutes and shutdown
g.
- 44
-
onths.

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

FataSirenaStory

Tabla de contenido