A - Battery Installation; B - Unloading The Machine From The Wooden Pallet; C - Standard Machine Equipment; Assembly Components - Ghibli & Wirbel R 150 FD 85 Instrucciones De Uso

Ocultar thumbs Ver también para R 150 FD 85:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 103
3.1.a - Battery installation (Fig. 3)
-
Lift the recovery water tank (11) using the
appropriate handles (25).
The tank will be kept open by the gas
spring (18).
-
Place the batteries as shown in the pic-
ture, connecting them as indicated in the
scheme, using the supplied cables and
plugs.
-
Connect the plug for the batteries (26) to
the socket (5).
-
Lower the recovery water tank (11) as-
sisting the downward movement.
NOTE:
The batteries must be installed and connect-
ed by qualified personnel.
3.1.b - Unloading the machine from
the wooden pallet (Fig. 4 - 5)
-
Position a ramp (27) and fasten it to the
wooden pallet.
-
Remove the wooden blocks (28) from the
three wheels.
-
Sit on the seat in driving position.
-
Turn the key (29) on "ON".
-
Turn the potentiometer (30) to about half
its stroke.
-
Shift the movement direction selector
(31) to "
" (forward) or "
then press the accelerator pedal (7) and
drive down the pallet using the ramp.

3.1.c - Standard machine equipment

(Fig. 6)
The accessories supplied are as follows:
32) Machine use and maintenance manual.
33) Battery charger instruction manual (if
present).
34) 2 brushes (machine mounted).
4.1.a - Squeegee installation (Fig. 7)
-
Insert the squeegee (20) into its support
plate (35) and fasten it by tightening the
two knobs (36).
-
Connect the suction tube (16) to the
squeegee's intake opening.
Charge the batteries in rooms which are
well-ventilated and comply with applica-
ble regulations in the country of use.
For safety-related information, follow
what is described in chapter 1 of this
manual.
For information and warnings about the
battery and on board battery charger (if
present) follow what is described in the
battery charger manual enclosed with
this document.
" (reverse),
When the machine leaves the factory, it is
calibrated to operate with gel batteries.
If other types of batteries are installed,
see the paragraph "Parameter setting".
The use of gel batteries with calibration
for acid or other batteries is prohibited.
10 hours are needed for complete battery
charging. Avoid partial recharges.
EN - 6
Professional Cleaning Machines Since 1968
4.1 - ASSEMBLY
COMPONENTS
5.1 CHARGING THE
BATTERY
DANGER:
WARNING:
WARNING:
NOTE:
www.ghibliwirbel.com

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

R 150 fd 100

Tabla de contenido