Operating Procedure - Agilent Technologies Turbo-V 2K-G Serie Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 67
17
Technical Information
MoniTorr
6
Figure 35
7
If during installation the program finds some system files that are out of date,
NOTE
you will be prompted to restart the computer. In this case proceed to restart the
computer and repeat the installation procedure.

Operating Procedure

Proceed as follows to correctly use the controller:
1
The MoniTorr detects when the pump's maximum rotation speed is
reached. At this point the acquisition and analysis of the data
deriving from the pump begins and is signalled by the flashing of the
Data Acquisition LED (yellow).
338/372
Select Install to go on with the installation. Thefollowing screen
is displayed on the personal computer monitor.
Select Finish to conclude the installation.
Power on the system. The related LED on the front panel will
come on.
Turbo-V 2K-G Pumping System User Manual / 87-900-968-01 (G)

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

969-8871969-8873

Tabla de contenido