Steelcase Thread Manual Del Usuario página 21

Ocultar thumbs Ver también para Thread:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

®
FLOORING WITH UNDERLAYMENT INSTALLATION (Continued)
APPLY INFILL STRIPS
• With all underlayment secured, apply the provided infill strips to each side channel in all
the Thread power tracks.
NOTE: Do not apply infill strips over screw heads in power tracks. Cut the infill material
and leave a small gap where any screw heads are located.
APPLY CONFORMABLE FLOOR COVERING
• With all underlayment secured, and infill strips applied to all power tracks, install the
conformable floor covering per the manufacturer's specifications. Make sure to use care in
cutting the flooring to match the radius cuts around the Thread junction points.
TIP: Use trim rings or the provided templates as a guide to cut flooring around junction
points to appropriate size.
APPLY TRIM RINGS AND COVERS
• After completion of the flooring installation, install all trim rings to the Thread junction points.
• Install all junction covers and secure with provided screws.
SIDE CHANNEL
DO NOT APPLY INFILL STRIPS OVER
TRACK MOUNTING SCREW HEADS
NO ADHESIVE ON
CONNECTOR AREA
INFILL STRIP
(4) TRIM RING FEET MUST
REST ON BUILDING FLOOR
AT THESE (4) LOCATIONS
JUNCTION COVER
(CONFORMABLE FLOOR COVERING)
TRIM RING
Page 21 of 75
24207101 Rev G

Publicidad

Tabla de contenido
loading

Tabla de contenido