Steelcase Thread Manual Del Usuario página 22

Ocultar thumbs Ver también para Thread:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

®
11a
CARPET INSTALLATION
11.
11b
• In order to lay the carpet over the connector, temporarily remove the NEMA filler.
This is required to get an accurate mark transferred to the carpet.
• Install a short center screw (provided with non-NEMA connectors) into center of
connector (11a).
• Fill the center of the screw with marking chalk (11b).
• Dry fit the carpet squares or rolled carpet across the first junction (11c).
• Lay the carpet over the screw. Press down on the carpet, over the screw, to
transfer the marking chalk (11c).
Vacuum all marking chalk & remove the screw.
11c
• Re-install all NEMA fillers that were temporarily removed.
• Using the (provided) round template, use the hole in the center of the template to
locate the mark. Mark the carpet around the outside of the template and cut (11d).
• Place the carpet on a surface that cannot be cut with a utility knife. In the case of
carpet squares, arrange the carpet squares as they will lay across the junction.
• Dry fit the carpet onto the junction again (11e).
• Apply adhesive to floor where carpet lays. This includes the power track,
power track infeed, ramps, and sub-floor. See page 19.
• Place trim ring into the newly cut carpet hole and align the four (4) tabs into
the corresponding wells in the junction (11f).
(Do this after the adhesive for carpet has been installed.)
11d
11f
11e
CUT PERIMETER AND LAY IN PLACE
INSTALL TRIM RING IN PLACE
LOCATE CENTER
Page 22 of 75
24207101 Rev G

Publicidad

Tabla de contenido
loading

Tabla de contenido