Connecting The V-Belts; Conectando Las Bandas-V - HYTROL 190-ACC Manual De Instalación Y Mantenimiento Con Información Sobre Seguridad Y Lista De Refacciones

Tabla de contenido

Publicidad

FIGURE 8A
"MATCH-MARK" NUMBERS
(ETIQUETAS DE ARMADO)
"A"
l

Connecting the V-Belts

Model ACC
The double groove sheave, located at one end of each con-
veyor section, is used to connect the driving V-Belts of the
conveyor. The groove in which each belt is placed is prede-
termined at the factory. (Figure 8B)
Beginning with the drive bed section, the drive V-Belt is
installed in the outside groove of the sheave. From this point
on, (in both directions) the belts will alternate from inside to
outside groove. (Figure 9A)
Note that take-up sheaves have been installed to align the
V-Belt with the respective grooves on the double groove
sheaves. (Figure 9B)
FIGURE 8B
8
La polea doble ranura de la banda-V, que está ubicada en
un extremo de cada sección del transportador, se usa para
conectar las bandas-V que impulsan del transportador .
La ranura en que se coloca cada banda se determina en la
fabricación . (Figura 8B) Empezando con la sección motriz, la
banda-V se coloca en la ranura exterior de la polea .
Desde este lugar, (en ambas direcciones) las bandas se
alternan de ranura interior a exterior . (Figura 9A)
Verifique que las poleas tensoras hayan sido instaladas para
alinear la banda-V con sus respectivas ranuras en las poleas
de doble ranura . (Figura 9B)
OUTSIDE GROOVE
(RANURA EXTERIOR)
ADJOINING CONVEYOR CHANNEL
(ESTRUCTURA DEL TRANS-
DETAIL "A"
PORTADOR ADYACENTE)
l

Conectando las Bandas-V

Modelo ACC
DOUBLE GROOVE SHEAVE
(POLEA DE DOBLE RANURA)
INSIDE GROOVE
(RANURA INTERIOR)
SPUR CHANNEL
(ESTRUCTURA DE ESPUELA)
"K" BRACKET
(ABRAZADERA "K")

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

190-lrc190-lrs190-lrss

Tabla de contenido