Installation
Electrical Installation
The Powerware 5140 requires a dedicated branch circuit that meets the
following requirements:
S
S
S
S
S
8
8. Connect the battery cable to the battery connector on the left
battery tray. Repeat for the right battery tray (see Figure 9).
9. Repeat Steps 5 through 8 to install the battery trays in each
EBM chassis.
10. Continue to the following section, "Electrical Installation."
Only qualified service personnel (such as a licensed electrician) should perform the
electrical installation. Risk of electrical shock.
40A circuit with short circuit and overcurrent protection
200–240 Vac
Single-phase
50/60 Hz
Flexible metal conduit is recommended for ease of service and
maintenance
Powerware
5140 Installation Guide for IBM Applications
®
Figure 9. Connecting the Battery Cables
W A R N I N G
05146790 A Uncontrolled Copy
S