Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Installation
Use the following procedure to install the REPO switch:

Power Distribution Unit

The high-to-low voltage PDU provides 120V output and up to 250 VA
with two low-voltage outlets (see Figure 14). Use the IEC jumper cords
provided with the PDU kit to connect to an IEC-320-C13 receptacle on
the UPS rear panel.
12
1. Confirm that the power is off at the main utility breaker.
2. Connect the switch or circuit to the REPO port on the UPS rear
panel using insulated 18–20 AWG (0.75 mm
3. Verify that the remote circuit is off.
4. Verify that the REPO switch is in the OFF position to enable
power to the output receptacles.
Powerware
5140 Installation Guide for IBM Applications
®
Figure 13. REPO Port
05146790 A Uncontrolled Copy
S
2
2
–0.5 mm
) wire.

Publicidad

Tabla de contenido
loading

Tabla de contenido