Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Installation

Installing the Batteries

To install the battery trays into the UPS and EBM chassis:
4
Only qualified service personnel (such as a licensed electrician) should perform the
battery installation. Risk of electrical shock.
1. Verify that the battery breaker on the UPS and all EBMs is in
the OFF position (see Figure 3).
Powerware
5140 Installation Guide for IBM Applications
®
Figure 2. Installing the UPS Chassis
W A R N I N G
Figure 3. Battery Breakers
05146790 A Uncontrolled Copy
S

Publicidad

Tabla de contenido
loading

Tabla de contenido