Step 9
Open lid. Place heat distribution plate on
top of fire pot down inside grill body
assembly.
Step 10
Place grease tray on support ribs directly
above heat distribution plate.
Step 11
Place cooking grills on support ribs
directly above grease tray.
Step 12
Insert front shelf in holes on grill body
assembly as illustrated.
Step 13
Hang the grease bucket on shoulder bolt
above the grease hole.
19
Cooking Grills
Grease Tray
Heat Distribution
Plate
Front Shelf
Fire Pot
Grease
Bucket