SMA Sunny Tripower 15000TL Instrucciones Para La Sustitución página 25

Ocultar thumbs Ver también para Sunny Tripower 15000TL:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 114
SMA Solar Technology AG
9. Insert the lower enclosure lid from above and flip it
down. The screws must protrude from the lower
enclosure lid.
10. Tighten all 6 screws in the order 1 to 6 (hex socket,
AF3, torque: 2.0 Nm) By tightening the screws in
the prescribed order, you avoid warping the
enclosure lid, which would keep it from sealing
correctly. Tip: If the screws fall out of the lower
enclosure lid, insert the long screw into the lower
middle hole and the 5 short screws into the other
holes.
11. Set the DC load-break switch to position O so that
both mounting screws are visible. In case the old DC
load-break switch is defective, the new one from the
spare-part set can be used.
12. Insert the DC load-break switch firmly into the intended opening on the inverter. During this
process, the DC load-break switch must still be in position O and aligned so that the screws
are positioned over the threads.
13. Tighten the 2 screws (torque: hex socket, AF3,
torque2.0 Nm).
Replacement Manual
8 Recommissioning the Inverter
STPTLEE-STPTL-10-BPDCLS-RM-xx-10
25

Publicidad

Tabla de contenido
loading

Tabla de contenido