Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Before operating the machine, the protection I (PICT.
9) must be completely lowered. For tilting head
mixers it must be checked that the bowl is correctly
inserted and blocked by the disk 0 and that the top is
down and blocked by the check pin M (this must be
completely inserted).

CONTROL DEVICES

Depending on the model, the machine is equipped with the following control devices:
FIG. 5
COMMAND
A) ON button
B) OFF button
F) Timer
Pos. 0
Pos. 1
Pos. 2
Speed control
Functional check first start:
After inserting the power cord plug into the mains socket, the machine is ready for functional verification.
Before starting the machine, make sure that all the protections are correctly installed.
When first starting, check that the spiral and the bowl rotate both clockwise. If this were
not to reverse the arrangement of the phases.
A
B
FIG. 6
ON - OFF SWITCH (FIG. 5)
Activates (1) movement of the rotating parts.
Stops (0) movement of the rotating parts.
allows the machine to start up and allows setting the working time
SPEED SELECTOR (FIG. 6)
Stops movement of the rotating parts.
Activates movement of the rotating parts at first speed.
Activates movement of the rotating parts at second speed.
Turning the knob, increases / decreases the speed of the tank and
FIG. 7
ACTION
TIMER (FIG. 7)
INVERTER (FIG. 8)
the spiral
FIG. 8
POSITION
Side of machine
Side of machine
Side of machine
Side of machine
Side of machine
Side of machine
Side of machine
20

Publicidad

Tabla de contenido
loading

Tabla de contenido