6.6 Electrical installation
6.6.1
The whole installation must be done by an authorised electrician, complying with the current provisions and
standards in the country of installation.
The electrical wiring diagram for the control panel is attached to the control panel (option).
Important: Installations done on site (cable ducts, fuel pipes, etc.) must not be fixed to the boiler panels!
Electrical connections shall only be made when all the other assembly operations (fixing, assembly,
etc,) have been done.
6.6.2
The mains connection cables and all the external boiler control connections must be made on site in an
appropriate way.
A disconnection unit complying with NF C 15-100 (2002) must be provided on the site.
6.6.3
The burner electrical connections (electrical power supply and control) are made by the customer depending on
the burner requirements.
1NO0P0007-D
Varjet 1 - 14
General warnings
Mains connection
Burner connection