lable.upon.request:.cod...8101541.
The. kit. is. for. use. on. an. accumulating.
boiler. with. capacity. equal. to. or. greater.
than.80.litres.
2.2.2   Sequence/cascade boilers  
(fig. 4)
For. sequence/cascade. installations.
using. polypropylene. smoke. collectors.
with. a. clapet. valve,. every. single. boiler.
that. makes. up. the. heating. system. must.
have. the. following. installation. parame-
ters.modified:
-.. P AR 1 = 61.(for.G20.NATURAL.GAS.boi-
lers)
-.. P AR 1 = 63.(for.G31.PROPANE.boilers)
Refer. to. section. 3.3. to. access. the.
INSTALLER.PARAMETERS.section.
ATTENTION:  In  sequence/cascade 
installations, it is mandatory to arrange 
the  thermal  system  with  the  hydraulic 
separator and safety devices.
2.3 
CONNECTING UP SYSTEM
To. protect. the. heat. system. from. dama-
ging. corrosion,. incrustation. or. depo-
sits,. before. installation. it. is. extremely.
important. to. clean. the. system. using.
suitable. products. such. as,. for. example,.
Sentinel  X300  (new  system),  X400  and 
X800 (old system) or Fernox Cleaner F3..
Complete.instructions.are.provided.with.
the. products. but,. for. further. informa-
tion,.you.may.directly.contact.SENTINEL.
PERFORMANCE. SOLUTIONS. LTD. or.
FERNOX.COOKSON.ELECTRONICS.
For. long-term. protection. agains. cor-
rosion. and. deposits,. the. use. of. inhibi-
tors. such. as. Sentinel  X100  or  Fernox 
Protector F1.is.recommended.after.cle-
aning.the.system..It.is.important.to.check.
the. concentration. of. the. inhibitor. after.
each. system. modification. and. during.
maintenance. following. the. manufactu-
rer's.instructions.(specific.tests.are.avai-
lable.at.your.dealer)..
The. safety. valve. drain. must. be. con-
nected. to. a. collection. funnel. to. collect.
any.discharge.during.interventions..If.the.
heating.system.is.on.a.higher.floor.than.
the.boiler,.install.the.on/off.taps.supplied.
in.kit.optional.on.the.heating.system.deli-
very/return.pipes..
WARNING:  Failure  to  clean  the  heat 
system  or  add  an  adequate  inhibitor 
invalidates the device's warranty.
Gas.connections.must.be.made.in.accor-
dance.with.current.standards.and.regu-
lations..
When. dimensioning. gas. pipes. from. the.
meter.to.the.module,.both.capacity.volu-
68
me. (consumption). in. m
3
/h. and. gas. den-
sity.must.be.taken.into.account..The.sec-
tions.of.the.piping.making.up.the.system.
must. be. such. as. to. guarantee. a. supply.
of. gas. sufficient. to. cover. the. maximum.
demand,.limiting.pressure.loss.between.
the. gas. meter. and. any. apparatus. being.
used.to.not.greater.than:
–. 1.0. mbar. for. family. II. gases. (natural.
gas);
–. 2.0.mbar.for.family.III.gases.(butane.or.
propane).
An. adhesive. data. plate. is. sticked. insi-
de. the. front. panel;. it. contains. all. the.
technical. data. identifying. the. boiler. and.
the. type. of. gas. for. which. the. boiler. is.
arranged.
2.3.1  Connection of condensation 
water trap
The. drip. board. and. its. water. trap. must.
be. connected. to. a. civil. drain. through. a.
pipe. with. a. slope. of. at. least. 5. mm. per.
metre. to. ensure. drainage. of. condensa-
tion.water..
The plastic pipes normally used for civil 
drains are the only type of pipe which is 
appropriate for conveying condensation 
to the building's sewer pipes.
2.3.2  Filter on the gas pipe
The.gas.valve.is.supplied.ex.factory.with.
an. inlet. filter,. which,. however,. is. not.
adequate. to. entrap. all. the. impurities. in.
the.gas.or.in.gas.main.pipes..
To. prevent. malfunctioning. of. the. valve,.
or. in. certain. cases. even. to. cut. out. the.
safety. device. with. which. the. valve. is.
equipped,. install. an. adequate. filter. on.
the.gas.pipe.
2.4 
INITIAL PHASE 
SYSTEM FILLING
The.charge.pressure,.at.cold.start,.must.
be.1 bar..
The. filling. is. to. be. done. slowly. to. allow.
air. bubbles. to. escape. through. the. air.
vents.
2.4.1  System draining (fig. 5)
To. drain. the. system,. turn. off. the. boiler.
and.use.the.discharge.valve.(1.fig..5).
2.5 
EXHAUST
The. boiler. is. supplied. with. a. 80. mm.
gasket,. which. must. be. fitted. over. the.
exhaust. terminal. prior. to. the. flue. being.
installed.(11.fig..6.-.fig..7.-.fig..8).
2.5.1  Type B  (fig. 6)
If. the. inlet. is. not. connected,. the. boiler.
should.be.regarded.a.Type B.device..When.
installing. the. boiler. in. locations. where. it.
needs.to.be.protected.from.water,.replace.
the.intake.terminal.inserted.in.the.flange.
with.terminal.code.8089510..
For. information. on. how. to. configure. the.
boiler.in.this.mode.see.figure..6..
The  maximum  overall  length  of  ø  80 
exhaust  flues  is  determined  by  the  load 
losses of the single accessories installed 
and should not exceed 16 mmH
The. exhaust. pipe. can. be. connected. to.
existing.chimneys..
When.the.boiler.works.at.low.temperatu-
re.is.possible.to.use.normal.chimneys.at.
the.following.conditions:
–. The. chimney. must. not. be. used. by.
other.boilers..
–. The. inside. of. the. chimney. must. be.
protected.from.direct.contact.with.the.
boiler.condensation...Combustion.pro-
ducts.must.be.conveyed.with.a.flexible.
piping. or. rigid. plastic. pipes. with. a.
diameter. of. about. 100-150. mm. provi-
ding. so. to. the. condensation. siphoned.
drainage. at. the. end. of. the. pipe.. The.
useful.height.of.the.siphon.must.be.at.
least.150.mm.
2.5.2  Type C (fig. 7 - fig. 8)
The. boiler. becomes. a. Type  C  device.
when. the. intake. terminal. is. removed.
from. the. flange. and. the. intake. is. con-
nected.to.separate.exhaust.ducts.(fig..7).
or.with.coaxial.exhaust.(fig..8).
2.5.3  Maximum usable length 
for separate ø 80 flues
The  maximum  overall  length  of  ø  80 
suction and exhaust flues is determined 
by  the  load  losses  of  the  single  acces-
sories  installed  and  should  not  exceed 
16 mmH
O.
2
When. the. segment. of. piping. is. between.
11-16. mm. H
O. it. is. necessary. to. check.
2
and,. if. needed,. correct. the. maximum.
and. minimum. pressure. adjustment. of.
the.gas.valve.as.specified.in.point.4.2.2.
2.5.4  Maximum usable 
length for coaxial ø 80/125 flues
In  installations  with  ø  80/125  coaxial 
exhaust,  the  maximum  horizontal 
length  including  the  90°  curve,  should 
O..
2

Publicidad