6
Installation
6.1
Personnel qualifications
•
Installation/dismantling work: The installation/dismantling must be
carried out by a qualified technician who is trained in the use of the
necessary tools and fixation materials.
6.2
Operator responsibilities
•
Observe national and regional regulations!
•
Observe locally applicable accident prevention and safety regula-
tions of professional and trade associations.
•
Provide protective equipment and ensure that the protective equip-
ment is worn by personnel.
•
Observe all regulations for working with heavy loads.
6.3
Safety
WARNING
Risk of burns from hot surfaces!
Pump housing and glandless motor can get hot and cause burns when touched.
• Only touch the control module during operation.
• Allow the pump to cool down before commencing any work.
WARNING
Risk of scalding from hot fluids!
Hot fluids can cause scalding.
Before the installation or removal of the pump or the dismantling of the housing screws, ob-
serve the following:
• Allow the heating system to cool down completely.
• Close shut-off devices or drain the heating system.
Installation and operating instructions • Wilo-Yonos MAXO/-D/-Z • Ed.01/2022-08
en
49