INSTALLATION

• The installation work – assembly and installation of the pump
chamber – may only be performed by qualified personnel in compli-
ance with the safety instructions.
• Before starting the installation work, the pump chamber must be
checked for transport damage.
Failure to comply with instructions for assembly and installation
jeopardises the safety of the pump chamber/personnel and voids the
safety declarations issued.

5.1. Installation types

• Concealed floor installation outside buildings
5.2. Installation
DANGER of falling!
Personnel can fall into the open pump chamber during installa-
tion and suffer serious injuries.
• During installation, the installation location must be appropriately
marked and secured.
• Always close the installed pump chamber with an appropriate
pump cover.
Note the following for installation of the pump chamber:
• This work must be performed by specialist personnel and electrical
work must be performed by a qualified electrician.
• The installation location must be frost-free.
• A second person must be present for safety reasons. Take the
necessary counter measures if there is a risk of toxic or suffocating
gases collecting.
• If lifting equipment is to be used for installation of the pump cham-
ber, problem-free installation of the lifting equipment must be en-
sured. The location where the pump chamber is used and set down
must be safely accessible with the lifting equipment. The set-down
location must have a solid bearing surface. To transport the pump
chamber, the lifting gear must be attached to the specified lifting
eyes. When using chains, these must be connected to the lifting
eyes using a shackle. Lifting gear must be technically approved.
• The power supply cables for the pump used and for the signal trans-
mitters must be laid in such a way that safe operation and prob-
lem-free installation/dismantling are possible at any time. Check
whether the cable present is long enough for its cross-section and
its installation type.
• Check the dimensioning documents (installation plans, inlet and
outlet conditions) for completeness and accuracy.
• Also refer to all regulations, rules and laws for working with heavy
and suspended loads. Wear appropriate protective clothing/equip-
ment.
• Please also observe the applicable national accident prevention
regulations and trade association safety provisions.
5.2.1. Work steps
1.
Preparatory tasks
2.
Pump chamber installation
3.
Setting up pipe connections
4.
Installing the pump chamber extension
• With pump chamber cover class A15 and B125
• With pump chamber cover class D400
5.
Filling the pit
6.
Installing the pump
7.
Installing the level control device
8.
Laying the pipes and connection cables
9.
Installing the pump cover
10. Final tasks
Installation and operating instructions Wilo-Port 600
English
45