Descargar Imprimir esta página

Hoshizaki KM-470AJE-R452 Manual De Instrucciones página 20

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 88
ENGLISH
Cleaning
4) Remove the front insulation panel, then slide the cube guide to the right. Remove the
rubber cap and sleeve covering the overflow pipe. See Fig. 6. Unscrew the overflow pipe.
After the water tank has drained, reconnect the overflow pipe. Replace the rubber hose,
overflow cap, cube guide, and front insulation panel. NOTICE! Make sure the O-ring is
attached to the bottom of the overflow pipe and be careful not to cross thread the
overflow pipe.
5) To fill the water tank, move the control switch to the "ICE" position, then replace the front
panel. After 3.5 minutes, remove the front panel, then move the control switch to the "OFF"
position.
6) Remove the front insulation panel, then pour 887ml of Hoshizaki "Scale Away" or the
other recomended Hoshizaki sanitizer as derected into the water tank. Replace the front
insulation panel. Turn the cleaning valve to the left until completely vertical (open).
7) NOTICE! To avoid excessive foaming, wait 1 minute before proceeding.
After 1 minute, move the control switch to the "WASH" position, then replace the front panel.
8) After 30 minutes, remove the front panel, then move the control switch to the "OFF"
position.
9) Remove the front insulation panel, then slide the cube guide to the right. Remove the
rubber hose and overflow cap covering the overflow pipe. Unscrew the overflow pipe. After
the water tank has drained, reconnect the overflow pipe. Replace the rubber hose, overflow
cap, cube guide, and front insulation panel.
10) In bad or severe water conditions, turn off the power supply, then remove, clean (cleaning
solution = 40ml. Hoshizaki "Scale Away" per liter of warm water), rinse, and replace the
cube guides, float switch, water supply tubes, spray tubes, and spray guides; turn on the
power supply when complete. Otherwise, continue to step 11.
Cleaning Rinse
11) Turn the cleaning valve to the right until completely horizontal (closed). Move the control
switch to the "ICE" position, then replace the front panel. After 3.5 minutes, remove the
front panel, then move the control switch to the "OFF" position. Note: The icemaker will not
operate unless the cleaning valve is completely closed.
12) Turn the cleaning valve to the left until completely vertical (open). Move the control switch to
the "WASH" position, then replace the front panel. After 5 minutes, remove the front panel,
then move the control switch to the "OFF" position.
13) Remove the front insulation panel, then slide the cube guide to the right. Remove the rubber
hose and overflow cap covering the overflow pipe. Unscrew the overflow pipe. After the
water tank has drained, reconnect the overflow pipe. Replace the rubber hose, overflow
cap, cube guide, and front insulation panel.
17

Publicidad

loading