Descargar Imprimir esta página

Installation; Scope Of Delivery; Selecting An Installation Site; Unpacking - Sartorius STAT-PEN YSTP01 Instrucciones De Manejo

Aparato para neutralizar la carga electrostática

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 42

Installation

4
Installation
4.1

Scope of Delivery

Item
Device
Power supply cable, fixed to the device
Ionization pin
Operating instructions
4.2

Selecting an Installation Site

Procedure
Make sure that the following conditions are met at
t
the installation site:
Condition
Requirements
Ambient conditions
— Suitability tested (see
Setup surface
— Stable and level surface
— Sufficiently dimensioned
Access to operation-
Convenient and safe
relevant parts
8
Operating Instructions STAT-PEN
Quantity
1
1
1
1
chapter 12.2, page 13
for ambient conditions)
for the device and the
operating area (for device
space requirements see
chapter "12.1 Dimensions
and Weights", page 13
and chapter "12.4
Operating Area",
page 14).
4.3

Unpacking

Procedure
Unpack the device.
t
CAUTION Risk of crushing if the device falls!
t
Make sure that the device has a suitable setup
surface (see chapter "4.2 Selecting an Installation
Site", page 8).
Install the device at the intended installation site.
t
4.4

Acclimatizing

When a cold device is brought into a warm environment:
the temperature difference can lead to condensation
(moisture formation) from humidity in the device.
Moisture in the device can lead to malfunctions.
Procedure
Allow the device to acclimatize for approx. 2 hours at
t
The installation site. The device must be
disconnected from the power supply during that
time.

Publicidad

loading