Descargar Imprimir esta página

Cebora SYNSTAR 270 T Manual De Reparaciones página 35

Srs edition
Ocultar thumbs Ver también para SYNSTAR 270 T:

Publicidad

Idiomas disponibles

Idiomas disponibles

□ Solenoid valve (13) starts operating.
Correct?
YES
ERROR CODE TEST
□ When the machine is turned on, after the start-up phase, an error status is displayed, i.e. display (1) shows a mes-
sage indicating the error type.
Correct?
NO
CONTROL AND SIGNAL TEST
□ After the start-up phase, all the steps involved in selecting "Process", "Mode" and "Programs", as described in the
Instruction Manual, can be carried out using the knob (2) and touch panel (1).
Correct?
YES
■ Check wiring between J2 of INV board on power board (56) and J5B of panel board (47).
■ Check wiring between J11 on power board (56) and J20
■ on panel board (47).
■ Replace power board (56) and/or panel board (47).
3302355
Check the wiring between J11 power board (56) and J20
panel board (47).
NO
Check power supply voltages of power board (56) and
panel (47) by performing the tests in section 3.3.1.).
YES
See section 3.4 Error codes.
Check the voltages of the power supplies to power boards
(56) and panel (47), by performing the tests in section.
3.3.1.
NO
Check that the correct program is set on panel board
(47), carrying out the "Firmware Update" procedure if
necessary (see section 2.4).
EN
35
35

Publicidad

loading

Este manual también es adecuado para:

564