Descargar Imprimir esta página

Scope Of Delivery - SMA Sunny Tripower CORE2 Manual De Instrucciones

Ocultar thumbs Ver también para Sunny Tripower CORE2:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 82
SMA Solar Technology AG
Grounding conductor test prior to recommissioning
Prior to recommissioning SMA inverters after the installation of SMA components or power
assemblies which cannot be replaced intuitively, ensure that the grounding conductor in the
inverter is correctly connected. The function of the grounding conductor must be ensured and
all locally applicable laws, standards and directives must be observed.
Observe superordinate standards
The repair work on devices and the consideration and application of other standards which
correspond to a superordinate standard is the responsibility of the qualified person performing
the work. Unauthorized alterations will void guarantee and warranty claims and in most cases
terminate the operating license. SMA Solar Technology AG shall not be held liable for any
damage caused by such changes.
3

Scope of Delivery

Check the scope of delivery for completeness and any externally visible damage. Contact the
Service if the delivery is incomplete or damaged.
123263-00.01 - Spare Part DC-SPD board STP 110-60
Quantity
1
24
4
1
202086-00.01 - SPD Type 1+2 board for STP 110-6x (retrofit kit) und
202757-00.01 - SPD Type 1+2 board for STP 110-6x (spare part)
Quantity
1
24
4
4
1
Replacement Manual
Designation
DC SPD assembly
Screw M4 with spring washer and washer
Screw M5 with spring washer and washer
Replacement Manual
Designation
DC SPD assembly
Screw M4 with spring washer and washer
Screw M5 with spring washer and washer
PCB bracket
Replacement Manual
3 Scope of Delivery
STPxxx-60-DC-SPD-RM-xx-11
11

Publicidad

loading

Este manual también es adecuado para:

Stp110-60