Descargar Imprimir esta página

haacon 4551.0,3 Manual De Instrucciones página 10

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 17
7. mOuNTING + OPERATION
After the initial assembly, still before start-up, the crane must
be examined by an expert (item 8) and the release confirmed in
the examination book.
Swivel jib crans - Assembly (fig. 2 + 3)
Assembly and disassembly by 2 persons
Always wear protective gloves.
Before initial operation, attach the suspension rope (optional 101524)
to the mast using the pin (152507) and with the adapter (152870),
optionally the attachment for chain hoist (152502).
(–> Relocation of adapter or mounting for chain hoist)
Fasten the rope winch to the mast using the mounting bracket (152510
(VA) / 152505 (galvanised)) (2 screws M10x100, as well as 4 screws
GB
M10x20, tightening torque 32 Nm).
Select the position depending on the application (–> moving the rope winch).
Guide the rope through the rope pulley and attach it to the rope winch
(–> rope assembly fig. 3 - fig. 4).
Dislocation of the rope winch (fig. 2):
Only move the rope winch when not under load!
z Loosen the 2 clamping screws M10x100 on the mounting
bracket.
z Move the rope winch.
z Tighten at the desired position with a torque of 32 Nm.
Note: The load rope must not rub against the rope winch.
The following rules apply always:
The rope must always be tensioned (loa-
ded), in order to prevent the rope jumping
the drum and pulley.
Winch - Mounting of rope
Hard solder the rope end clamp to the rope drum with a hexagonal wrench
(SW4) (fig 3).
After rotating the crank in clockwise direction, the rope must reel up on
the drum as illustrated in fig. 4.
fig. 3
094416_a_de_gb_fr_es_pt_it_nl_drehkr_s
top position
bottom position
fig. 2
fig. 4
haacon hebetechnik gmbh – Telefon +49 (0) 9375 - 84-0 – Fax +49 (0) 9375 - 8466
Winch - Operation
A functional test must always be accomplished before
beginning work.
Lift the load: Turn crank clockwise.
Lower the load: Turn crank anti-clockwise.
> 3
Move the adapter (fig. 5):
Only move when not under load!
z Release cotter pin (100557) and withdraw bolt (152507).
The suspension rope (101524, optional) can fall
out.
z When the desired projection is reached, attach the adapter
(152870) / suspension rope (101524, optional) with pin
(152507) and cotter pin (100557) according to fig. 5.
without relocation rope
100557
152507
fig. 5
Moving the mounting for chain hoist (fig. 6):
Only move when not under load!
z Release cotter pin (100557) and withdraw bolt (152507).
The suspension rope (101524, optional) can fall
out.
z When the desired projection is reached, attach the mounting
(152502) and suspension rope (101524, optional) with pin
(152507) and cotter pin (100557) according to fig. 6.
without relocation rope
100557
152502
152507
101524
fig. 6
Manual chain hoist - Operation
The chain hoist is not included in the delivery.
Please order separately. Operating and maintenance
instructions are enclosed at delivery.
> 1,5 x rope-Ø
option: with relocation rope
100557
152870
152870
152507
101524
option: with relocation rope
10

Publicidad

loading

Productos relacionados para haacon 4551.0,3

Este manual también es adecuado para:

4571.0,345534573