4. Installation instructions
4. Installation instructions
4.1. Prepare for installation
The following recommendations are a guide to help you plan the installation
of the DLB Kit:
•
Confirm the maximum current capacity per phase of the home or facility.
This value defines the maximum configured capacity for dynamic load
balancing.
•
Ensure that the electric wires where the current sensors will be mounted
have basic or reinforced insulation.
•
Ensure that a suitable length of network cable can be routed from the
charging station to the DLB installation.
Note
The network cable must have a maximum length of 30 m (unshielded)
or 150 m (shielded).
•
Ensure that there is one module space on a DIN rail in the power supply
cabinet.
4.1.1. Tools and materials required
1. Torque Screwdriver, PH1
2. Wire cutter
3. RJ45 crimp tool
4. Tape measure
* Network cables can have a pre-installed RJ45 plug, or the RJ45 plug can
be installed before or after routing the network cable into the charging
station.
5. RJ45 plugs 2x (optional) *
6. Network cable (Cat5, Cat5e,
Cat6), with twisted paired wires *
EN