Descargar Imprimir esta página

EVBOX Dynamic Load Balancing Kit Manual De Instalación página 19

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 67
4. Installation instructions
3. Make sure that unauthorized persons cannot access the work area.
4. Route the network cable from the
charging station to the DLB
installation.
5. In the power supply cabinet, mount
the DLB adapter on the DIN rail.
6. If the current sensors use stranded
wires, install wire end sleeves
(without plastic sleeves) and apply a
square crimp for optimal fit into the
DLB adapter.
EN
15

Publicidad

loading

Productos relacionados para EVBOX Dynamic Load Balancing Kit