Descargar Imprimir esta página

EVBOX Dynamic Load Balancing Kit Manual De Instalación página 20

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 67
EN
7. For each current sensor, connect the
white wires to the DLB adapter white
terminals, and the black wires to the
DLB adapter black terminals, as
shown in the table. For each phase,
connect current sensor wires to the
same terminal numbers.
Power supply
1-phase
2-phase
3-phase
16
Current sensor wire
White
Black
White
Black
White
Black
4. Installation instructions
DLB adapter terminal

Publicidad

loading

Productos relacionados para EVBOX Dynamic Load Balancing Kit