Descargar Imprimir esta página

Nanosonics trophon EPR Manual Del Usuario página 11

Ocultar thumbs Ver también para trophon EPR:

Publicidad

Idiomas disponibles

Idiomas disponibles

A4.2
Cable Management System Installation
The Cable Management System is designed to facilitate ease of use of the trophon EPR by
holding the ultrasound cable away from the chamber door, and providing a convenient
location to store the cable during High Level Disinfection. Refer to section B2.3 for using the
Cable Management System.
To install the Cable Management System:
1. Open the chamber door before mounting the Cable Management System to the
device.
2. Peel back the protective strip from the double sided tape on the bottom of the Cable
Management System (see Figure 7).
3. Align and slide the two hooks on the front of the Cable Management System into the
slots in the device chamber (see Figure 8 - 1) until it cannot slide any further.
4. Push Cable Management System down on top of the device to secure it in place (see
Figure 8 – 2).
Figure 7
A4.3
Powering On
1. Attach the power cable supplied with the device to the device power socket.
Equipment must be connected to an earthed outlet.
2. Switch on at the mains power
3. Turn on the power switch, located on the side of the device to 'ON'
®
trophon
EPR User Manual – USA/Canada
Figure 8
L00035 1.0 03/2014
11

Publicidad

loading

Productos relacionados para Nanosonics trophon EPR