INSTRUCTION MANUAL
PHOTOVOLTAIC ARRANGEMENT
SWITCH OR FUSE
Figure - General scheme of the system with external electronic controller
After energized (Power light on), the equipment will only start operating when the external controller ON/OFF
switch is in the ON position.
Make the electrical connections according to the electrical diagram below and make sure that the U V W
motor phases are correctly connected to the terminals of the external eletronic controller.
Photovoltaic
Array
For your safety and safety of the installation, make sure that all cables are correctly connected before
connecting the equipment.
48
NOTE: QUANTITY OF PANELS FOR
ILLUSTRATIVE PURPOSES ONLY
(SYMBOLIC)
(CC)
Well
Figure - Electrical scheme with level sensors (well and tank)
EBARA BOMBAS AMÉRICA DO SUL LTDA.
3TSM ci/ce and 4TSM ci
NOTE: CONTROLLER
IMAGE FOR ILLUSTRATIVE
PURPOSES ONLY
SWITCH ON/OFF
TH
GND
GND
or
GND
TL
K2
Not used
Models
WEL
or
K1
Tank