en
�4 | ��M�� T�S�� �� | First start up
4.
First start up
4.1
�npacking
1. Remove the packaging paying attention to nails
detaching.
i
After unpacking check the integrity of
JUMBO TCS52 NW and check that no components
are visibly damaged. In case of doubt do not proceed
to start-up and contact a qualified technician and/or
your vendor.
2. Take out of the transport crate the standard accesso-
ries and the packaging materials.
i
Dispose correctly of packaging material, hand it over
to the designated collection points.
4.�
Installation
4.�.1
Machine positioning
1. Insert the appropriate lifting belts (length belt 1: 1.5
Mt, belt 2: 2 Mt), with sufficient capacity, as shown.
�arning - tilting danger!
The barycentre of the JUMBO TCS52 NW is
not in its centre.
¶
It is necessary to lift the machine slowly.
|
1 695 301 901
2011-07-14
2. Lift the JUMBO TCS52 NW with a lift crane and
install it in the chosen area respecting the minimum
distances shown in the picture.
i
For safe and ergonomic use of the
JUMBO TCS52 NW it is recommended to leave a mi-
nimum of 750 mm space from the nearest wall and
of 900 mm from the ceiling.
�arning - tilting danger!
During tire inflation considerable forces are
exerted.
¶
The JUMBO TCS52 NW has to be fixed in
JUMBO TCS52 NW has to be fixed in
at least 3 points on the floor.
has to be fixed in
Sicam srl società unipersonale