Descargar Imprimir esta página

Porsche Home Energy Manager Manual Del Usuario página 14

Ocultar thumbs Ver también para Home Energy Manager:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 72
Installation and connection
PIN
Signal
1
RS485 signal B -
2
RS485 signal A +
3
Ground
4
Ground
5
CAN Low
6
CAN High
Information
Note the connector orientation when plugging into
Home Energy Manager! Pins 1, 3, 5 are rounded, pins
2, 4, 6 rectangular.
Connection to the power grid
Installation of Circuit Breakers
Information
Line protection fuses are not included in the scope
of delivery and must be installed by a qualified elec-
trician.
12
The energy manager does not have any internal
fuses, which means that the inputs of the voltage
measurement, the external power supply and the re-
lay must be protected with suitable back-up fuses.
The operation of the energy manager requires
overcurrent protection of all supply lines. It is
important to select fuses with sensitive tripping
criteria.
The selection of fuse elements is based on the
commercially available components of the re-
spective country of use.
Components with the lowest tripping current
and the shortest tripping time must be used.
Prepare distributor cabinet
For information on the space requirement of the en-
ergy manager:
g Refer to chapter "Technical Data" on page 31.
e
Provide 11.5 pitch units on a DIN rail for installa-
tion of the energy manager inside the distributor
cabinet.
e
Install the power supply unit of the energy man-
ager at a distance of at least 0.5 pitch units to its
housing.
e
Protect all electrical interfaces from direct/indi-
rect contact.
Fig. 11: Prepare distributor cabinet
A
11.5 pitch units
B
9 pitch units
C
0.5 pitch units
D
2 pitch units
Assembly in distributor cabinet
b Top-hat rail mount on the housing of the energy
manager is unlocked.
1. Place the top-hat rail mount on the top-hat rail
in the distributor cabinet at an angle.
2. Tilt the housing of the energy manager and place
it flat on the DIN rail.
3. Lock the DIN rail mount on the housing of the
energy manager.

Publicidad

loading