Descargar Imprimir esta página

Porsche Home Energy Manager Manual Del Usuario página 9

Ocultar thumbs Ver también para Home Energy Manager:

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 72
Connection diagram
Fig. 2: Wiring diagram
L1 L2 L3
up to 3 phases
N/PEN
Neutral conductor
100-240 VAC
Input voltage
24 VDC
Output voltage
NOTE
The assignment of phases L1 - L3 mayg (Fig. 2)
differ from the illustration shown. Please check the
phase assignment of your home connection.
Displays and controls
Fig. 3: Displays and controls
Displays
Description
LED lights up green: Energy Man-
ager is ready for operation.
On/Off
status
LED lights up green: Internet con-
nection established
Internet
status
LED flashes blue: Hotspot mode –
no client connected
WiFi status
LED lights up blue: Hotspot mode,
at least one client connected
LED flashes green: Client mode, no
WiFi connection available
Displays
Description
LED lights up green: Client mode,
WiFi connection available
LED lights up or flashes blue: Paral-
lel operation in client mode is possi-
ble.
LED flashes yellow: WiFi connection
setup via WPS
LED flashes green: Searching for
PLC network connection.
Powerline
LED lights up green: PLC network
Communi-
connection established.
cation
LED flashes blue: Activating DCHP.
(PLC) net-
work sta-
LED lights up blue: DHCP (only for
tus
PLC) is active and there is a PLC
network connection.
LED lights up green: Network con-
nection established.
Ethernet
status
On: LED lights up green during com-
munication (currently not assigned).
RS485/
CAN status
LED flashes or lights up yellow: Error
present
Error sta-
LED lights up red: Functions re-
tus
stricted
Overview
7

Publicidad

loading